A smart way to perform loadtransfere subsea or disconnect one lifting rope.
An element that allows for a loadtransfere from one lifting rope to another
• No external power needed, all operations by ROV manipulators
• Easy release subsea, by ROV
• Load tested with lifting certificate.
• Connecting of a Masterlink subsea, by ROV, is possible
• Releasepin is secured against accidental release by a securing lock. (ROV operated)
Imenco TRI Plate
A smart way to perform loadtransfere subsea or disconnect one lifting rope.
An element that allows for a loadtransfere from one lifting rope to another
• No external power needed, all operations by ROV manipulators
• Easy release subsea, by ROV
• Load tested with lifting certificate.
• Connecting of a Masterlink subsea, by ROV, is possible
• Releasepin is secured against accidental release by a securing lock. (ROV operated)
Related products
Hydraulic shackle lifting arrangement
Read moreReceptacle for Bottom Releasable Mini Guideposts – MRBR
Read moreGuidepost Extension – GPE 8 M4 L FMC 242
Read more